YOİ Mühendislik technician working on a split air conditioner indoor unit

Equipment relocation and transport

When you move or renovate, we remove your air conditioner without losing refrigerant and recommission it leak-free at the new location, with measurements.

In shortRelocating an air conditioner involves pumping the refrigerant down into the outdoor unit, removing the indoor and outdoor units, piping and installing them at the new location, nitrogen pressure testing, vacuuming and, if needed, topping up the refrigerant. A poorly done relocation leads to refrigerant loss, leaks and compressor failure. YOİ Mühendislik relocates split, multi-split and cassette air conditioners, VRF indoor units and heat pumps with full measurements.

About equipment relocation

When moving home or office, the air conditioner is often the last thing considered; yet if an AC is removed incorrectly, its refrigerant escapes, and if the pipe ends are left open, moisture and dirt get into the system. When the pipe length changes at the new location, the additional refrigerant charge must be calculated, the connections pressure-tested with nitrogen and the system evacuated.

Scope of service

  • Pumping the refrigerant down into the outdoor unit (pump down)
  • Removal of indoor and outdoor units, capping of pipe ends
  • Positioning and drainage planning at the new location
  • Copper piping, insulation and cable replacement
  • Wall drilling, bracket and hanger installation
  • Nitrogen pressure test and vacuum
  • Additional refrigerant charge based on pipe length
  • Commissioning and measurement report
Manifold and pressure gauges used in AC commissioning
The unit is not started at the new location until evacuation and pressure tests are completed.

Relocation steps

  1. Site survey: inspection of the current and new locations, pipe length and materials list
  2. Refrigerant recovery and safe removal of the unit
  3. Installation, piping and drainage at the new location
  4. Nitrogen test, vacuum and refrigerant top-up if needed
  5. Handover with commissioning, pressure and temperature measurements

Buildings we serve

Home moveOffice moveStore and renovationSchool and public buildingHotel room refurbishmentFactory layout change

Our base is in Ankara Etimesgut. We provide equipment relocation services daily in Ankara, and on a project and contract basis in all 81 provinces of Türkiye, including İstanbul, İzmir, Bursa, Antalya, Konya, Kayseri, Eskişehir, Kocaeli, Adana, Gaziantep, Samsun and Trabzon. See our service areas.

Frequently asked questions

Can I remove and move the AC myself?

Not recommended. If an AC is removed without pumping down the refrigerant, the refrigerant escapes, moisture enters the open pipe ends and the risk of compressor failure at the new location increases.

Is refrigerant needed when relocating?

If the refrigerant was recovered properly and the pipe length did not change, it is usually not needed. If the piping was extended, an additional charge is added according to the manufacturer's values.

Can the existing copper pipes be reused?

Pipes can be reused if they are sound and the right length; crushed, short or contaminated pipes are replaced. This is decided on site during the site survey.

How long does relocation take?

Removing a single split air conditioner and installing it in a new location is usually completed the same day; for multiple units, the timeline is planned during the site survey.

From 1 unit to 1,000 units, from a single provider.

Sales, installation, maintenance and repair for all brands and equipment. Nationwide across Türkiye.